Work Information

June, 01/2001 ~ December 31/2003         :           PT. Bredero Price Indonesia (Batam)

Position                                                :           Quality Control Manager.

 

Responsible for implementation of PT. Bredero Shaw Indonesia Clients specification and Bredero quality procedures/Inspection Test Plan for Shell Oman (Salalah Gas Pipeline Project), TotalFina-Elf, Gulf Indonesia, Unocal Thailand, Marubeni/Itochu for Apache Energy Limited, Bp Indonesia and Bechtel Snamprogetty Joint Venture (Karachaganak Development Project), Power Gas Singapore, Mitshubishi for Patricia Baleen Project, PT Saipem for CONOCO ADGF project during external coating with three layers polypropylene, three layers polyethylene, fusion bonded epoxy, coal tar/asphalt, concrete weight and polyurethane foam, anode installation and internal coating (COPON HF epoxy).

Wood Side Energy Ltd for Trunkline System Expansion (TSEP) project, +/- 120 Km of 42” SAW pipes coats with the following coating system, Internal coats with 60 to 95 microns of COPON 2306HF solvent base epoxy paint and External with 4 to 7 mm Asphalt coating thickness, 74 and 90 mm concrete thickness at 3400 Kg/m3 as applied concrete density. PT Perusahaan Gas Negara (PGN) for Gas Tranmission and Distrubution Branchline Batam to Singapore subsea gas pipelines project +/- 200 Km of 28” SAW pipes coated with the following coating system, Internal coats with 80 to 125 microns of COPON HW 2306HF solvent base epoxy paints, External with Polyethylene (PE) and 74 to 90 mm concrete coating thickness at 3040 Kg/m3 as applied density. Marubeni-Itochu for ExxonMobil Indonesia, 5.0 km of 16” x 0.344” wall thickness (stainless steel clad and carbon steel jacket) coated with 3.0 mm polypropylene coating thickness. PT JR McDermott Indonesia for CONOCO Belanak 24”/16” and 6” ± 100 km gas pipelines project during external coating with asphalt enamel, concrete weight, anode installation and internal coating (COPON HF epoxy).

 

 

February, 08/2001 ~ May, 05/2001          :           TOTALFINA-ELF -  MYANMAR .

Position                                                :           Painting Inspector

 

Responsible for implementation of TOTAL FINA ELF – MYANMAR specification during maintenance painting work for Off Shore process, wellhead platform and living quarters.

Report progress and inspection to Site Representatives and Senior Quality Control Engineer at Yagon office.

 

September, 22/2000 ~ October, 03/00     :           CAMPBELL & ASSOCIATES PTE LTD.

Position                                                :           Coating Inspector.

 

Responsible for implementation of  BHP PETROLEUM PTY LTD, Zamzama – 1 Flowline three layers polypropylene specification  No. 10335-00-N8754 Rev.0 during coating process/activity and load out coated pipes at PT Bredero Price Indonesia-Batam on behalf of Kvaerner E&C Australia Pty Ltd.

 

September, 20/2000 ~ Sept, 21/2000       :           UNITED PIPELINES LTD.

Position                                                :           Coating Inspector.

 

Carried out inspection of 172 joints polypropylene coated pipes for Gulf Indonesia (Gelam Pipelines) at Bredero Price Batam.

                                                           

July, 24/00 ~ August, 18/00                    :           PT INDOSPEC ASIA.

Position:                                               :           Third Party Coating Inspector.

 

Responsible for implementation of Premier Oil Natuna Sea Limited Project Specifications for ANOA GAS EXPORT Pipelines project during three layers polypropylene, concrete weight coating and anode installation at PT Bredero Price – Batam.

 

 

October, 14/1999 ~ March, 31/00            :           CONOCO INDONESIA.

Position                                                :           Coating Inspector.

 

Responsible for implementation of CONOCO – WNTS specification during internal and external coating, Internal coats with COPON EP 2306 HF Epoxy and External coats with asphalt enamel and concrete weight coating and anode installation for WEST NATUNA TRANSPORTATION SYSTEM at PT. Bredero Price IndonesiaBatam Island

(1 st pipeline gas from Indonesia to Singapore) and reported daily inspection to CONOCO site Senior Coating Inspector.

 

 

April, 26/1999 ~ June, 24/1999                :           CAMPBELL & ASSOCIATE PTE LTD.

Position                                                :           Coating Inspector.

 

Responsible for implementation of SHELL NIGERIA specification no DEP 31.40.30.31.GEN

During three layers polyethylene coating for SPDC-EKULAMA AG GATHERING PIPELINES PROJECT (NIGERIA) and report daily inspection and coating progress reports to BOUYGUES OFFSHORE Quality control/ Expediting Coordinator at his head office in PARIS.

 

February, 15/99 ~ March, 30/99              :           PT. Komaritim.

Position                                                :           QC Coordinator (Temporary assignment)

           

Responsible to coordinate while welding activities, welding qualification record and welder qualification test for TOTAL INDONESIA Peciko offshore pipelines and Tunu

Phase 6 GTS6/EPSC2 pipelines and reported daily activities to TOTAL INDONESIE Representative on board ANNETTE.

 

December, 10/99 ~ January, 15/99          :           PT. Komaritim.

Position                                                :           Coating Inspector.

 

Responsible for implementation of TOTAL INDONESIE Specification during three layers polypropylene coating and concrete weight coating for Tune Phase 6 GTS6/EPS2 at

PT. Bredero Price IndonesiaBatam Island and reported daily inspection and coating progress report to PT. Komaritim, Project Manager and QA/QC Manager at their head office in Jakarta.

 

June, 11/1992 ~ November, 31/1998        :           ARCO INDONESIA.

Position                                                :           QC Inspector.

           

Responsible for implementation of ARCO INDONESIA Specifications and related codes. During Fabrication of Offshore Platforms, Jackets, Boat Landing, Compressor Modules, Pressure Vessels, Pipelines Coating, Chemical Injection Skids, Gas Scrubber complete with its associate instrumentation devices, Structural Pipe racks, Civil works for Gas Compressors, Pressure Vessels, Pipe Racks, Power Generators, Gas Processing Modules, Flare Tip and during Offshore/ Onshore Installation of Platforms, Jackets, Compressor modules, Pressure Vessels, Pipelines Installation at ARCO Contractor fabrication yard, Offshore works barges and Onshore.

Reported daily inspection and progress to ARCO INDONESIA QA/QC Manager in Jakarta office.

 

February, 1992 ~ June, 1992                   :           BREDERO PRICE MALAYSIA.

Position                                                :           Senior QC Inspector.

 

Responsible for implementation of clients specification ACT CHINA and CARIGALI PETRONAS during polyurethane foam and FBE fusion bonded epoxy coating at Bredero Price Malaysia ~ Kuantan Pahang.

 

 

January, 09/1982 ~ February, 1992          :           PT. BREDERO PRICE INDONESIA.

Position                                                            :           Senior QC Inspector.

 

Responsible for implementation of various client specification during internal and external coating, such as coal tar/asphalt enamel, painting, polyurethane foam, concrete weight coating, anode installation and buckle arrestor for oil and gas pipelines at PT. Bredero Price Indonesia at their coating plant in Batam, Reported daily inspection to Regional QA/QC Manager in Singapore office.

 

 

Job Title

QC Manager.

Department or workgroup

Quality Control.

 

Back to top

Contact Information

Address                                    :           Komplek GMP Blok B No: 1 Tg, Sengkuang

                                                            Batu Ampar Kodya Batam Riau Indonessia

                                                            Post Code: 29432.

                                                            Phone: 62-778-411611 or 62- 0811701424.

 

E-mail address

E- Mail Address                         :           mujiantoali@yahoo.com

 

Web address

www.brederoshaw.com

Office phone

62-778-412 275

Back to top

Current Projects

  • PetroChina (Pipeline coating)
  • ConocoPhillip (Pipeline coating)

 

Back to top

Biographical Information

Name                                        :           Mujianto Ali (Ali).

Position                                    :           NACE Certified Coating Inspector.

Date of birth                               :           September 29/1960.

Marital Status                            :           Married with four (5) kids.

Nationality                                 :           Indonesian.

Education                                  :           Diploma.

Course                                      :           NACE CIP Session 3 and Peer Review in Singapore on March 30 up to 5 April 2003 Register No: 6858

                                                            ISO 9001:2000 Internal Quality Audit based on ISO 19011 (FDIS) conducted by PQM at Hotel Harmoni Batam on 11 to 12 April 2002.

                                                            Upgrading to ISO 9001:2000 conducted by PQM at Hotal      Harmoni  Batam from 14 to 15 February 2002.

 

                                                            NACE CIP – Coating Inspection Technician Session (Level) 11 ID No. 6858.

 

                                                            NACE CIP – Coating Inspection Technician Session (Level) 1   ID No. 6858.

 

                                                            The Welding Institute, School of Welding and    Technology.

 

                                                            American Welding Society, Certified Associate Welding   Inspector, ID No. 96110374.

 

                                                            Granton Institute of Technology, Diploma in Painting and Coating.

 

                                                ICS International, Diploma in Industrial

                                                Instrumentation.

 

 